Marjorie McClure School | Complete Network Infrastructure & Security Installation

HQ Systems was appointed to deliver the structured cabling, fibre optic infrastructure, temporary construction site CCTV, and Paxton access control systems as part of the new-build Marjorie McClure School development.

Working alongside the principal contractor, our engineers delivered each phase of the project in line with the construction programme, ensuring every system was professionally installed, fully tested, and commissioned to the highest standard. From the site’s core network infrastructure through to secure access control, the completed installation provides a reliable, future-ready foundation to support the school for many years to come.

Our Solution

Structured Cabling & Fibre Infrastructure

To provide a resilient, high-performance network capable of supporting the school’s day-to-day operations, HQ Systems installed a total of 290 Cat6A network and security cabling links, comprising 251 Cat6A data outlets and 39 dedicated security network connections. All cabling was professionally terminated into local network cabinets positioned throughout the school, creating a structured and scalable network infrastructure.

A new fibre optic backbone was also installed between network cabinets, delivering high-speed connectivity across the site and ensuring the network is capable of supporting future technologies and increasing digital demands.

Every copper network link was fully Fluke tested and certified, while all fibre optic links were professionally tested to verify performance. The completed installation is backed by a 25-year manufacturer-backed warranty, providing complete confidence in the long-term reliability of the network infrastructure.

Site IP CCTV

During the construction phase, HQ Systems supplied, installed, and commissioned a 38-camera Hikvision IP CCTV system to provide comprehensive security across the site while building works were underway.

The temporary surveillance system was strategically positioned to monitor key areas of the construction site, helping to protect equipment and materials, improve site security, and provide clear visibility throughout the build. Each camera was connected via a dedicated Cat6 network link, integrating seamlessly with the temporary site network infrastructure.

Following installation, the system was fully configured, tested, and commissioned to provide reliable high-definition recording and live monitoring throughout the construction programme, supporting the principal contractor in maintaining a safe and secure working environment.

Paxton Access Control

To provide secure, centrally managed access throughout the completed school, HQ Systems installed and commissioned a comprehensive Paxton Net2 access control system across 16 controlled doors.

The installation included 16 Paxton door controllers, three intercom stations, and three internal handset phones, providing secure communication and controlled access to key areas throughout the building. The system was integrated with the school’s network infrastructure and configured using Paxton Net2 management software, allowing the school to easily manage staff access permissions and expand the system as required.

Initial access credentials were programmed during commissioning, ensuring the system was fully operational and ready for use upon project handover.

Conclusion

The successful completion of the Marjorie McClure School project has provided the client with a modern, fully integrated technology infrastructure designed to support both the construction phase and the long-term operation of the school. From the installation of a high-performance structured cabling and fibre optic network to temporary construction site CCTV and intelligent Paxton access control, HQ Systems delivered a complete solution tailored to the project's requirements.

With fully tested and certified installations, scalable infrastructure, and industry-leading technology throughout, the school now benefits from a secure, reliable, and future-ready platform that will continue to support staff, students, and visitors for many years to come.

A complete technology infrastructure, delivering secure access, resilient connectivity, and dependable performance from construction through to occupation.


Also view

The London Beer Factory | Multi-Site Audio, AV & Security Upgrades

The London Beer Factory | Multi-Site Audio, AV & Security Upgrades

HQ Systems has worked closely with The London Beer Factory to deliver a range of technology, audio, AV, and security upgrades across multiple venues within their hospitality portfolio, including Hole in the Wall, The Barrel Project, and Ten Bells.

Read more
Royal Neuro Hospital | Fibre Optic Infrastructure Upgrade

Royal Neuro Hospital | Fibre Optic Infrastructure Upgrade

HQ Systems was appointed to upgrade the fibre optic infrastructure at the Royal Neuro Hospital in London, delivering a high-performance network capable of supporting the demands of a busy healthcare environment. The project required the installation of new 10G fibre optic links between key buildings while removing outdated infrastructure to improve safety, reliability, and future network capacity.

Read more
Elmley Nature Reserve | Full Site Network & Wireless Infrastructure Upgrade

Elmley Nature Reserve | Full Site Network & Wireless Infrastructure Upgrade

HQ Systems was appointed to deliver a complete network infrastructure upgrade at Elmley Nature Reserve, a prestigious wedding and events venue set within a unique rural location. The project required a reliable, high-performance network capable of supporting day-to-day operations, large-scale events, and seamless connectivity across multiple buildings spread throughout the site.

Read more
Get your own website by Pitched Logo